Go-Live Gate Review
An independent check on one AI pilot before real users or real decisions depend on it. I measure it against your own cases, take it through twelve go-live gates with the people who will own it, and give you a written verdict: ship, ship with conditions, or not yet.
What the Go-Live Gate Review is
Most AI pilots stall at the same point. The demo went well, the team wants to launch, and nobody can say with evidence whether the system is good enough to carry a real business process. Risk and compliance ask the right questions late, and the launch date slips.
The Go-Live Gate Review settles that question in a week. It is an AI audit of one system, scoped to the decision in front of you: can this pilot go live, and if not, what exactly stands in the way? It is built on the Go-Live Gate, a checklist of forty questions across eight areas, twelve of which are gates. If any gate is still a no, the pilot isn't ready, however good the demo looked.
I do the work myself, with your team, on your system.
What you get
- A measured baseline. A small evaluation set built from your own cases, each with its expected answer, and the pilot's score against it, overall and by type of case.
- A written verdict. Ship, ship with conditions, or not yet, with the evidence for each gate, in a form your business owner, risk lead and engineering lead can sign.
- The three things to fix first. Ordered by what unblocks the most, with an owner for each.
- A fixed-price plan for production. What it would take to close the open gates and ship, scoped and priced, so you can decide without another round of discovery.
- The evaluation set itself. It stays with you and becomes the start of the test suite the system will need in production.
How the week runs
| Day | What happens |
|---|---|
| Monday | Kick-off with the business owner and engineering lead. Agree what correct means for this system and collect real cases from the people who do the work today. |
| Tuesday | Build the evaluation set: real cases with expected answers, including edge cases, unhappy paths and inputs the system should refuse. |
| Wednesday | Measure the pilot against the set. Review architecture, data flows, failure behaviour and cost per transaction. |
| Thursday | The gate review: four to six people, about an hour, working through the forty checks. The business owner, the engineering lead, whoever will run it in production, and someone from risk or security. |
| Friday | Written verdict, the three fixes, and the production plan, presented to the sponsor. |
The twelve gates
Every gate must be fully true before go-live. Gates can't be marked "not applicable": each is written to apply to any system that carries a real business process. "We think so" counts as no.
| # | Gate | The question behind it |
|---|---|---|
| 1.1 | One named person owns the business outcome and can stop the project | Who owns this? |
| 1.2 | The success metric and target were written down before the results came in | How will we know it worked? |
| 2.1 | A fixed test set of real cases, each with its expected answer | How do we know the output is correct? |
| 2.2 | The agreed pass threshold is met, overall and for each type of case | Is it good enough? |
| 3.1 | A data-flow map: which providers see which data, and what stays inside | Where does our data go? |
| 4.1 | Failure behaviour is defined, and every failure is visible | What happens when it's wrong? |
| 4.3 | A person reviews the output wherever being wrong is expensive | Who catches the expensive mistakes? |
| 5.1 | Cost per transaction is measured, and the business case holds at that cost | Can we afford it at volume? |
| 6.1 | Production quality is monitored, not just uptime, with alerts | How will we know when it degrades? |
| 6.3 | A failover plan: a measured fallback, or an agreed manual process | What if the model disappears? |
| 7.1 | A named team owns the system in production, with on-call cover | What happens when the builders leave? |
| 8.1 | Risk, legal and security sign-off path agreed with them early | Who signs it off? |
The full checklist, with all forty items, owners and a scoring guide, is free to download. You are welcome to run it without me.
The three verdicts
| Verdict | When | What happens next |
|---|---|---|
| Ship | All 12 gates, and 32 or more of 40 items | Open items go on a dated list with owners. First production review 30 days after launch. |
| Ship with conditions | All 12 gates, and 24 to 31 of 40 items | Each condition gets an owner and a date. Exposure is limited until they close: a named user group, capped volume, or running alongside the current process. |
| Not yet | Any gate open, or fewer than 24 items | Close the gates first. They are usually weeks of work rather than months. |
Price
£10,000 plus VAT, fixed, for one week on one pilot. If you go ahead with Pilot to Production within 60 days, the fee is credited in full against it.
The method in practice
The same discipline, at engagement scale: a natural-language analytics platform went from under 60% to 98% query success in four weeks, starting with a fixed 35-case evaluation suite. And in a regulated onboarding process, KYC review fell from up to an hour per applicant to about five minutes, with every decision left with the analyst.
Questions
Is this an AI audit?
Yes, of one system rather than your whole AI programme. It is an independent check of whether a specific pilot is ready for production, against named criteria and measured on your own cases. A broad audit tells you where your organisation stands. This tells you whether one system can go live, and what to fix if it can't. If you want the organisation-wide view first, the AI readiness assessment takes about six minutes.
What do you need from us?
Access to the pilot and the people who built it, real cases from the people who do the work today, and four to six people for about an hour on Thursday: the business owner, the engineering lead, whoever will run it in production, and someone from risk or security.
What if the verdict is "not yet"?
That is what the review is for. You leave with the open gates named, an owner against each, and a fixed-price plan for closing them. The gate missing most often is the fixed test set (2.1), and the review starts building it for you. If launch pressure is real, run the system in shadow, alongside the current process with nobody acting on its output, while the gates close.
Does the pilot have to be built in-house?
No. A system built by a vendor or a partner needs the same evidence before your organisation depends on it, and the gates are the same. The vendor's own assurance is an input, not a substitute for measuring the system on your cases.
Can we just use the checklist ourselves?
Yes, and many teams should. The checklist is free. The review adds a measured baseline you don't have to build yourselves, and someone with no stake in the answer chairing the conversation.